Thread: New Project Car
View Single Post
  #49  
Old 02-15-2012, 09:48 AM
28HopUp's Avatar
28HopUp 28HopUp is offline
Moderator
 
Join Date: Oct 2008
Location: South Carolina
Posts: 4,531
Default

Thanks guys! It's still a work in-progress. For Christmas, Jack got a set of line-locks which need to be installed. I plan to run an in-line fuse under the hood so they can be disabled on the street. I sent out the splitport heads and lower intake to be ported and polished, which should be coming back soon. A new camshaft (I forget the specs) will be installed at the same time. The head swap will get underway in about a month (I'm waiting for the garage to not be so cold!). From there, we'll have the car towed to a local shop to be dyno tuned.
__________________
Bill Jr.

To everyone out there, wherever you are. Remember, the light at the end of the tunnel may be the police chasing you down in their own Mustang!
Reply With Quote